Seamless and efficient integration of Battery Energy Storage Systems (BESS) into your substation projects:
- BESS Layout and Design – Development of BESS layouts, elevations, and building General Arrangements (GAs).
- Site Cabling Design – Overall site cabling and cable cross-section interfacing design.
- Manufacturer Collaboration – Close collaboration with leading BESS manufacturers.
- LV/Multicore/Fire/Fibre Cable Integration – Full integration of all cabling within the primary design layouts.
- Specification Compliance – Ensuring full adherence with all relevant UK grid codes and industry standards.

